BCG 24 central-heating sealant for leaks of 30 litres/day 2,5 l

zł936.61 Grosszł761.47 Net

BCG 24 central-heating sealant for leaks of 30 litres/day 2,5 l.

Dispatch within:
1 day
Shipping cost incl. VAT:
from zł0.00
Availability:
Available
Weight:
0,3 kg
Secure payments
BLIK Przelewy24

Delivery with our partners

InPost Paczkomaty GLS DHL Pocztex

Available options depend on the products and delivery address.

Share

BCG 24 liquid sealant for central-heating systems losing up to 30 litres of water per day. 

BCG 24 is a specialist liquid sealant that effectively eliminates leaks in heating systems, boilers, pipelines, radiators and underfloor heating.

The fluid seals all commonly used materials (plastics and metals). BCG 24 crystallises on contact with ambient air, forming a durable, ageing-resistant mechanical seal at the leak. 

APPLICATION:


  • System type: Heating systems, boilers, pipelines, radiators, underfloor heating. Can also be used in open systems.
  • Leak size: For systems losing 0 to 30 litres of water per day.

NOTES!

  • Equipment safety: Correct use does not damage pumps or control valves.
  • Other applications: For gas boilers (water heaters) or condensing units, the manufacturer recommends using BCG 30 E.
  • System preparation: Before use, we recommend thoroughly flushing the system to remove deposits and impurities. The heating system must be free of additives such as antifreeze, corrosion inhibitors and brine. If they are present, drain and flush the system with water, then refill and seal it as instructed. Check the pH: with the correct dose, it should be between 10,5 and 11. Insoluble in other chemicals.

THE SEAL IS:

  • durable and resistant to ageing,
  • resistant to high temperature and pressure.

INSTRUCTIONS FOR USE:

Mixing ratio: 1,5 litres per 100 litres of heating water.

Leaking boiler:

  • Disconnect the heating system from the boiler and bring the boiler to operating temperature. Set the maximum permissible temperature with the boiler thermostat.
  • Shake the BCG 24 container thoroughly. Add the required amount (see the table supplied with the packaging) through the drain valve. Fill the boiler to 1 bar. Thoroughly bleed the circulation pumps using the inspection screw. The boiler must operate for 4 hours.
  • Enable return-temperature raising if available. After sealing, drain and flush the boiler. Refill the boiler and restart the system.

Leaking system:

  • The heating system must be filled with water and bled. Set the maximum temperature with the boiler thermostat.
  • Fully open all mixing and radiator valves. Remove the filters. Bleed the circulation pumps and leave them running.
  • Reduce the heating-water volume by the required amount of BCG 24. Shake the BCG 24 container thoroughly. Preferably premix the required amount with water and add through the drain valve.
  • Fill the heating system to operating pressure. Thoroughly bleed the circulation pumps again using the adjustment screw.
  • The heating system must operate continuously under the above conditions without lowering the temperature. Sealing takes one or more days depending on conditions, but we recommend leaving BCG 24 in the system for at least three days. During this period, the pH must be between 10,5 and 11,0.
  • After sealing, thoroughly flush and refill the system, bleed the circulation pump again and start the system.

IMPORTANT: 

  • If the connected boiler is still under the manufacturer's warranty, we recommend bypassing it, i.e. providing heat and circulation with an external pump and heat source. In this case too, we recommend flushing the system again after 3 days.
  • If the leak can be traced to a specific heating circuit, disconnect it from the system and flush it. Connect the isolated loop to equipment (a pump) providing continuous water circulation in a heated closed circuit, and carry out the sealing process in this way.

SAFETY AND STORAGE:

  • Precautions: Observe the general safety precautions for handling chemicals.
  • Warning: Keep out of reach of children!
  • In case of spills or leaks: immediately remove BCG 24 from surfaces (tiles, sinks, etc.) with water, as otherwise crystallisation that cannot be removed may occur.
  • Disposal: See the safety data sheet.
  • Shelf life: 5 years from the date of manufacture.
  • Storage conditions: Protect from frost.
Technical data
Capacity
2500 ml
Form
Canister

  • Brand
  • Reference
    4002524
  • Waga
    0,3 kg
  • In stock
    10 Items
  • EAN13
    4010001025014

  • Condition
    New
  • Sales unit
    pcs
  • Brand
    Other
  • Pack volume [ml]
    2500

Workplace safety warnings — in accordance with Regulation (EU) 2023/988 on general product safety:
1. Eye protection:
– Always wear safety goggles or a face shield to protect your eyes from sparks, particles and metal fragments.
2. Hearing protection:
– When working in a noisy environment, use ear defenders or earplugs to prevent hearing damage.
3. Respiratory protection:
– When working in dusty surroundings or in the presence of fumes, wear a filtering mask or an appropriate respirator.
– Ensure proper ventilation of the workstation.
4. Hand and skin safety:
– Use protective gloves that protect against mechanical injuries and chemicals.
– Where necessary, use protective creams to prevent irritation and dry skin.
5. Work clothing:
– Work in protective clothing resistant to sparks and splashes.
– Avoid loose clothing, jewellery and loose hair near machinery.
6. Fire risk:
– Keep the workstation free of flammable materials (e.g. paper, fabrics and chemicals).
– Keep a serviceable fire extinguisher close at hand and know how to use it.
7. Electrical hazards:
– Check the condition of cables and electrical equipment before use.
– Do not use electrical devices in damp conditions.
– Disconnect equipment from the power supply during maintenance or repairs.
8. Use of machinery and tools:
– Regularly inspect the technical condition of machines and tools.
– Use equipment in accordance with the manufacturer's instructions.
– Blades and tools should be maintained regularly and kept in good condition.
– Machines should be fitted with appropriate guards and protective devices.
9. Handling materials:
– Use handling equipment to move heavy components.
– Lift and carry using ergonomic practices to avoid injury.
10. Working with chemicals:
– Store chemicals in labelled, safe containers.
– Use substances in accordance with the manufacturer's instructions and occupational health and safety rules.
– Ensure air circulation when using chemicals.
Other important rules:
– Keep the workstation clean and tidy.
– Ensure adequate lighting in the working area.
– Provide occupational health and safety training.
– Carry out regular safety audits and comply with current regulations.

Comments (0)

No customer reviews for the moment.

4 other products in the same category

Viewed products

Loading...
Back to top